Steelhead LNG is proposing to develop the Malahat LNG Project on the Malahat-owned Bamberton Industrial Lands. The floating liquefaction production facilities will be permanently moored to jetties along the shoreline for the life of the proposed Project and will be supported by minor land-based infrastructure. Currently in the preliminary engineering and design stage, it is proposed that at full build out, there will be one LNG carrier loading at the facility every 3-5 days. The proposed Malahat LNG Project will undergo rigorous federal and provincial regulatory processes, including rigorous multi-year Environmental Assessments. We are currently undertaking environmental studies to gain a greater understanding of the local and regional area.

For more information on the proposed Malahat LNG Project, please click here.

News

STEELHEAD LNG TO PRESENT AT CWC CHINA LNG CONFERENCE more
STEELHEAD LNG STATEMENT ON BC ELECTION more
Steelhead LNG attracts international project finance expertise to its leadership team more

Stay Informed

Contact Us

Address 2200 – 1075 West Georgia Street
Vancouver, BC V6E 3C9
Phone Office: 604-235-3800 / 250-277-4886
1-855-860-8744 (toll-free)
Media: 604-646-3559

×